Every project follows a structured delivery process. You have visibility at every stage. Nothing goes to development until the design and architecture are approved. Nothing goes live until every item on the pre-launch checklist is confirmed.
01. Discovery and Technical Requirements
We start with your business requirements, integration needs and what the development needs to achieve, not just a design brief but a technical specification. What CMS suits your team? What third-party systems need to connect? What are the performance targets? What does your SEO need from the site architecture? Every development decision flows from the answers here.
02. Sitemap, Architecture and Technical Specification
We define the full URL structure, page hierarchy, CMS content types, database schema and integration points before any design or development begins. This document is the contract between design, development and marketing, and it prevents the most expensive problem: realising after build that the structure is wrong.
03. Design and Development Infrastructure in Parallel
Digiwhiz designers and developers work from the same specification. While design is being finalised in Figma, development infrastructure, hosting, version control, staging server, CMS skeleton, is already being set up. This reduces total project time without cutting corners.
04. Front-End Development
We build from approved Figma designs to production-quality HTML, CSS and JavaScript. Every page is pixel-accurate to the approved designs, fully responsive across all screen sizes and optimised for page speed from the first line of code. No page builders, no themes, just clean, maintainable code.
05. Back-End Development and CMS Build
CMS content types, templates and editorial fields are configured to match how your content team actually works. Third-party integrations, CRM, booking system, analytics, payment gateways, are built and tested during development, not added as post-launch bolt-ons.
06. Quality Assurance and Pre-Launch Audit
Before any Digiwhiz website goes live, it passes a full QA process: cross-browser testing, device testing, Core Web Vitals benchmarking, accessibility review, schema markup verification, redirect validation and analytics event testing. A pre-launch checklist is shared so you can see exactly what was confirmed.
07. Deployment, Launch and Post-Launch Monitoring
Digiwhiz manages the production deployment, DNS transition and Search Console monitoring. We watch for indexation changes, crawl errors and ranking fluctuations in the weeks after launch, and fix anything unexpected before it costs you leads.